3) Los Banos Project: May 2006 - July 2006

  • (1) Application: Compozer

  • (2) Purpose: To prevent liquefaction and increase bearing capacity

  • (3) Quantity
    Number of Columns: 2,479
    Diameter of Columns: 1.5ft (0.45m) to 2.4ft (0.73m)
    Installation Depth: 12.0ft (3.66m) to 24.0ft (7.32m)
    Total Installation Length: 43,950ft (13,396m)