fudo_toplogo

8) Puyallup Project: September 2007 - October 2007

  • (1) Application: Compozer

  • (2) Purpose: To prevent liquefaction and increase bearing capacity

  • (3) Quantity
    Number of Columns: 534
    Diameter of Columns: 2.5ft (0.76m)
    Installation Depth: 35.0ft (10.67m)
    Total Installation Length: 18,690ft (5,697m)
Puyallup Project: September 2007 - October 2007



Copyright © 2023 Fudo Construction, Inc. All rights reserved.